Saturday 4 May 2013

Dowley Gap Take 2

Back in February BW drained the locks and aqueduct at Dowley Gap (see my report) in order to effect various repairs which included new lock gates and bank strengthening.
New lock gates at Dowley Gap
Bank repairs at Dowley Gap Embankment


Dowley Gap Aqueduct rewatered
 





What a shame that the top set of gates was not replaced at the same time as the other two sets.

Dowley Gap top gates still leaking ferociously


In order for the bottom gates to be opened I had to reverse into this waterfall which soaked my legs and swamped the rear deck.

No comments:

Post a Comment

Comments will be removed if considered inappropriate